Additional charges
Sometimes there may be charges that apply in addition to the fees in your Energy Plan Details (EPD). Some fees only apply if you request the related services.
Processing fees
Any changes, such as new meters to an existing supply, existing metering changes, or supply and/or meter removal at an existing site, come with a $150 processing fee (including GST). This includes installing new equipment (like solar panels, batteries, or EV chargers), or upgrading, replacing, or adjusting metering equipment or network assets.
Adding a new connection to your account comes with a $350 processing fee (including GST). A new connection means setting up a brand-new electricity supply point on the network, involving installing a new meter.
Victorian business customers
A $2.50 fee applies to requests for a paper bill by post, except in some cases.
A fee may be charged if a cheque is dishonoured or reversed. Flo will pass through the $5.00 charge from our bank, plus any insufficient funds costs from your bank.
The fees below are set by your distributor and include GST:
- Citipower: $51.19
- Powercor: $75.83
- AusNet Services: $52
- Jemena: $70.79
- United Energy: $71.04
The below fees are set by your distributor and include GST:
- Citipower: $51.95
- Powercor: $80.60
- AusNet Services: $52
- Jemena: $101.52
- United Energy: $71.04